Shipping to France from Turkey: Prices and Guide
Ship from Turkey to France: LTL 140-180 EUR/m³ (8-12 days). A.TR provides duty-free entry for industrial goods. French VAT (TVA) 20%. Kolay Parsiyel covers all French cities.
Shipping to France
France is a key European market accessible from Turkey via regular road freight services. A.TR certificate provides duty-free entry for industrial goods.
Prices
| Service | South France | North France | Time |
|---|---|---|---|
| LTL/m³ | 140-160 EUR | 160-180 EUR | 8-12 days |
| Van (8m³) | 1,100-1,400 EUR | 1,300-1,600 EUR | 6-9 days |
French Customs
- A.TR: 0% duty (industrial)
- TVA (VAT): 20% standard
- Fiscal representation mandatory for non-EU importers
- Documents may need French translation
FAQ
Transit time?
LTL 8-12 days, FTL 5-9 days.
Paris shipping cost?
LTL m³ 160-180 EUR (North France zone).
Fiscal representation needed?
Required for non-EU companies importing commercially.
Food products?
Packaged, labeled dry food acceptable. EU food safety compliance required.
References
- French Customs (Douane)
- Turkey-EU Customs Union
Related Articles
FCL vs LCL: Container vs Partial Load Shipping
FCL (Full Container Load) dedicates an entire container to one shipper; LCL (Less Container Load) shares container space among multiple shippers. FCL is cheaper above 15 m³; LCL is ideal for 1-14 m³ shipments.
Customs Broker vs Customs Agent: Same Role, Different Names
Customs broker (US/international), customs agent (UK), and customs representative (EU) all refer to the same profession: licensed professionals who clear goods through customs on behalf of importers and exporters.
Air vs Road Freight: Speed vs Cost Guide
Air freight delivers in 1-3 days but costs 3-8 EUR/kg. Road freight takes 5-10 days at 120-160 EUR/m³. Air suits urgent, small, and high-value shipments; road suits volume and standard timelines.
Road vs Sea Freight: Mode Selection Guide
Road freight is fast (5-10 days) and flexible with door-to-door service. Sea freight is economical for large volumes but slower (10-18 days). The right mode depends on volume, urgency, and budget.