Skip to main content
Kolay ParsiyelKolayParsiyel
Knowledge Base

Air vs Road Freight: Speed vs Cost Guide

Air freight delivers in 1-3 days but costs 3-8 EUR/kg. Road freight takes 5-10 days at 120-160 EUR/m³. Air suits urgent, small, and high-value shipments; road suits volume and standard timelines.

AdminMarch 24, 20266 min

Air vs Road Comparison

FactorAirRoad
Speed (Turkey-Germany)1-3 days5-10 days
Cost3-8 EUR/kg120-160 EUR/m³
CapacityLimited (ULD-based)Up to 80 m³
Best forSmall, urgent, high-valueVolume, standard timeline
Door-to-doorAirport transfer neededDirect
CO2Highest per ton-kmModerate

Choose Air When

  • Urgent delivery (1-3 days)
  • High-value goods (electronics, pharma)
  • Small/light shipments (under 50 kg)
  • Samples and documents

Choose Road When

  • Volume shipments (1+ m³)
  • Standard timeline acceptable (5-10 days)
  • Cost efficiency priority
  • Furniture, household goods

Cost Example

100 kg / 0.5 m³ Istanbul to Berlin: Air ~600 EUR (2 days). Road ~300 EUR (8 days). Road 50% cheaper but 6 days slower.

FAQ

Breakpoint?

Under 50 kg / 0.3 m³: air may be competitive. Above: road is cheaper.

Kolay Parsiyel air service?

Road freight specialist. Air via DHL, UPS, FedEx.

Hazardous goods?

Air: IATA DGR rules. Road: ADR rules. Both require special handling.

Combined?

Yes, air to hub + road last mile (multimodal) is possible.

References

  • IATA Cargo Statistics
  • European Commission Transport

Related Articles